四川省汶川地震灾区震后山地灾害综合风险评价
DOI:
作者:
作者单位:

1. 大连理工大学,水利工程学院,辽宁,大连,116024;黑龙江省水利科学研究院,黑龙江,哈尔滨,150080
2. 大连理工大学,水利工程学院,辽宁,大连,116024
3. 北京时空筑城建筑设计有限公司,大连分公司,辽宁,大连,116085

作者简介:

通讯作者:

中图分类号:

TV1

基金项目:

国家科技支撑计划课题"重大滑坡、泥石流灾害综合风险评估技术"(2008BAK50B04);科技部国际合作项目"汶川地震灾区山地灾害评估与预警报应用技术"(2009DFR20620);国家公益性行业(气象)专项"强降水诱发山体滑坡、泥石流气象预报警报技术"(GYHY201006039)


Integrated Risk Assessment of Mountainous Hazards in Seismic Disastrous Areas of Sichuan Province After Wenchuan Earthquake
Author:
Affiliation:

LI Mei-juan1,2,XU Xiang-zhou1,XU Shi-guo1,ZHAO Guang-hui3(1.School of Hydraulic Engineering,Dalian University of Technology,Dalian,Liaoning 116024,China,2.Heilongjiang Provincial Hydraulic Research Institute,Harbin,Heilongjiang 150080,3.Dalian Branch,Beijing Space-time Creator Architecture Design Co.,LTD,Liaoning 116085,China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    汶川地震触发了大量次生山地灾害,震后山地灾害活动风险对灾区的发展规划决策有着重要的参考价值.通过对四川境内震后灾区基础资料的分析和研究,分别对灾区的44个县(市)进行了山地灾害危险性、易损性和风险评价,并以震后灾害点密度对危险性评价结果进行了验证,结果发现二者之间具有线性函数关系.评价结果表明,高度危险区集中于龙门山断裂附近,并且呈现明显的带状分布,面积比例为39.8%;极高易损和高度易损区则主要分布于成都、绵阳、德阳、雅安等大城市周边地区,面积比例为13.1%;高度风险区则主要位于龙门山腹地向山前平原的过渡带,属于高度危险和高度易损的结合部位,面积比例为11.0%.高风险区是今后恢复重建和发展规划中需要重点关注的地区;中度风险区由于灾后恢复重建的推进,其承灾体的易损性将会上升,容易导致其向高度风险转化,也要给予重视.

    Abstract:

    Wenchuan earthquake caused a variety of secondary mountainous hazards.Risk assessment regarding secondary hazards is therefore very important for reconstruction projects in the affected areas.Based on regional data analysis,assessments of dangerousness,vulnerability,and risk were carried out.A linear relationship was found between dangerousness degree and disaster density.Assessment results show that highly dangerous regions concentrated along Longmengshan fault,accounting for 39.8%of the total area.Regions of high and extremely high vulnerability mainly surrounded the cities of Chengdu,Mianyan,Deyang,and Ya'an,accounting for 13.1%of the total area.Regions of high risk,accounting for 11%of the total area,occupied the transitional zone between Longmeng Mountain and the piedmont plain,which had high dangerousness degree and high vulnerability,respectively.Special attention should be paid to the regions of high risk and vulnerability during the reconstruction.However, the regions of moderate should also be cared as the risk and vulnerability of these areas could be potentially deteriorated due to the rapid expansion of the reconstruction areas.

    参考文献
    相似文献
    引证文献
引用本文

苏鹏程,韦方强,徐爱淞,江玉红.四川省汶川地震灾区震后山地灾害综合风险评价[J].水土保持通报,2011,(1):231-237

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2010-07-25
  • 最后修改日期:2010-08-11
  • 录用日期:
  • 在线发布日期: 2012-10-25
  • 出版日期: