侵蚀坡地草被快速恢复与控制水土流失技术研究
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:

国家基金项目“南方花岩山地生态恢复与重新后的生态环境效应研究”(40571096)


Rapid Restoration of Grass Coverage and Techniques for Controlling Soil and Water Loss in Eroded Hilly Lands
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    研究了在侵蚀坡地采用条沟-草块的特殊建植草地方法。在治理后的3个月内,用条沟-草块建植草地的小区其土壤侵蚀量仅为140 kg,比整地但无种植、原坡面和全垦等高种草的小区分别减少了823,249和670 kg。用条沟-草块建植草地的小区当年的土壤侵蚀为1 500 t/km2,比整地但无种植、原坡面和全垦等高种草分别减少了10 591,3 514和7 760 t/km2;第2a以后,条沟-草块草地的土壤侵蚀量均在700t/km2以下。治理3a后侵蚀坡地的草被物种由6种发展到16种。在侵蚀坡地治理当年,坡地的植被覆盖率就可达85%,能在短期内控制水土流失。

    Abstract:

    The method of planting grassland with strip trenches and grass blocks was studied in eroded hillside fields.After planting grassland with strip trenches and grass blocks,the amount of soil and water loss in the runoff plot within 3 months was only 140 kg.It decreased 823,249 and 670 kg,respectively,in comparison with the plots of no-planting with soil surface prepared,original slope surface and contour planting with full reclamation.Soil and water loss rate in the runoff plot with strip trenches and grass blocks was 1 500 t/km2 in the first year.It reduced 10 591,3 514,and 7 760 t/km2,respectively,in comparison with the plots of the no-planting with soil surface prepared,the original slope surface and the contour planting with full reclamation.Soil and water loss rate in the runoff plot with strip trenches and grass blocks was less than 700 t/km2 in the next year.The types of grass vegetation increased from 6 to 16 after three year construction.Coverage rate increased by 85% in the first year of controlling eroded hillside fields.These show that soil and water loss can be controlled in a short time.

    参考文献
    相似文献
    引证文献
引用本文

陈宏荣.侵蚀坡地草被快速恢复与控制水土流失技术研究[J].水土保持通报,2006,(4):68-70

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2005-06-24
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2014-11-26
  • 出版日期: