Primary Exploration of Soil Erosion and Harnessing Technologies of Gongbo Gorge Hydropower Station in Upper Reaches of the Yellow River
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    结合黄河上游公伯峡水电站建设具体情况,针对该区域内独特的地质、土壤和气候条件,在主体工程和辅助工程施工区内,划分出了不同的治理区域。在分析该区水土流失成因的基础上,采取工程治理和植物治理相结合的方法,提出了适合该区域内的主要治理措施,为黄河上游同类水电站的开发建设与水土流失治理提供了借鉴。

    Abstract:

    Considering the construction of the Gongbo Gorge Hydropower Station in the upper reaches of the Yellow river, and the areas unique geology, soil and climate, the different harness areas are identified in both the major and subsidiary project construction regions. On the basis of an analysis of the causes of soil erosion, methods combining project treatment with vegetation treatment are adopted, and the main treatment measures suited to the area are brought forward. This study also provides references relating to the exploitation and construction of homogeneous hydropower stations and the treatment of soil erosion in the upper reaches of the Yellow river.

    参考文献
    相似文献
    引证文献
引用本文

王海,星玉寿.黄河公伯峡水电站水土流失预防及治理技术初探[J].水土保持通报,2003,(5):66-69

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2003-07-03
  • 最后修改日期:2003-09-10
  • 录用日期:
  • 在线发布日期: 2014-11-28
  • 出版日期: