Abstract:The reservoir of Qingxi hydropower station is a new -built, day-controlled and medium-scale reservoir.Due to earlier stage deposit seriously, the reservoir-life and economic benefit of the hydropower station has been affected directly, and it has at tained great benefit after comprehensive controlling in soil and water loss since 1994.