晋西北地区淤地坝减洪减沙效益计算方法研究
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:

国家“八五”科技攻关项目 85-926-03-01


Calculating Method of Sediment and Flood Reducing Benefit by Silt Arrester in Northwestern Shanxi Province
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    通过应用晋西北地区淤地坝典型调查资料,结合水文观测资料的分析,提出:把淤地坝按已经淤满和正在淤积尚未淤平分别计算年减洪量和年减沙量,使计算结果符合多洪多沙年(丰水年)淤地坝多蓄多拦这一基本特征,为黄河中游淤地坝拦蓄效益计算提供了新的途径,在晋西北片水土保持措施减洪减沙效益研究中,该方法得到成功应用。

    Abstract:

    After analysing the data of typical investigation and hydrological survey in Northwestern Shanxi province,the result shows that the calculating result would fit to the basic characteristic of storing more flood and sediment by silt arrester in the year of more flood and sediment than mormal year if we calculate the amount of annual flood and sediment reducing.A new method of calculating the sediment retaining in middle reaches of the Yellow river is suggested,it has used in the analyses of sediment and flood reducing benefits on the eight tributaries of Yellow river in northwestern Shanxi province,and a good result has been obtained.

    参考文献
    相似文献
    引证文献
引用本文

刘勇,冉大川,罗全华,刘斌,吴永红.晋西北地区淤地坝减洪减沙效益计算方法研究[J].水土保持通报,1997,(5):30-34

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:1997-06-13
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2014-11-28
  • 出版日期: